Set up the processing priority and create the work packages according to the project requirements: (such as the material available and required on-site date, on-site installation sequence, etc.);
Create work package according to different disciplines (piping, structure, electrical & instruments, etc.);
Created work package based on different subcontractors (locations, workshops);
Each Assembly / Spool can be assigned to a specific team or worker